We can't find the internet
Attempting to reconnect
Something went wrong!
Hang in there while we get back on track
Blossom76
Blossom 76, Jumeirah Village Circle
About this Project
Construction Status
Project Details
-
•Type: apartment
-
•Launch Date: 2024-12-01
-
•Completion Date: 2027-03-29
Amenities
Project Timeline
-
•Construction Started: 16/08/2024
-
•Booking started: 01/12/2024
-
•Expected Completion : 29/03/2027
Available unit types from developer
APARTMENT
Studio
Available Layouts
| Layout Type | Size (sqft) | Floor Plan |
|---|---|---|
| Type A | 410.00 | View |
APARTMENT
1 Bedroom
Available Layouts
| Layout Type | Size (sqft) | Floor Plan |
|---|---|---|
| 1 Bedroom with study-Type B | 837.00 | View |
| 1 Bedroom with study and Plunge Pool-Type D | 953.00 | View |
| 1 Bedroom with study-Type A | 1,038.00 | View |
| 1 Bedroom with study and Plunge Pool-Type A | 969.00 | View |
| 1 Bedroom with study and Plunge Pool-Type B | 1,043.00 | View |
| 1 Bedroom with study and Plunge Pool-Type C | 1,155.00 | View |
APARTMENT
2 Bedrooms
Available Layouts
Option 1
down payment
10%during construction
50%handover
40%Option 2
down payment
10%during construction
40%handover
50%Monthly Payment Calculator
📋 Note:
This is an estimate only. Actual rates and terms may vary based on your credit profile, bank policies, and current market conditions. Additional costs like insurance, registration fees, and bank charges are not included.
Location
Blossom 76 , Jumeirah Village Circle
Blossom 76 is a strong investment opportunity in Jumeirah Village Circle, offering modern amenities, efficient layouts, and a prime location. This development is well-suited for investors seeking high rental yields and long-term growth potential
Blossom 76 is developed by Tranquil Infra Developers, a trusted name known for delivering quality residential projects in prime locations
The starting price for Blossom 76 is 595,888 AED
The delivery date for Blossom 76 is set for Q1 2027. This timeline ensures timely handover and is backed by the developer's track record of meeting commitments
Option 1: 10% Down payment at sales launch 50% During construction 40% On handover Option 2:(Limited Time – Valid till December 31) {60/40 - 50/50} 10% Down payment at sales launch 40% During construction 50% On handover Option 3 (Limited Time – Valid till December 31): 10% Down payment 50% During construction (with a 1% payment plan) 40% On handover
Launch Price
*Prices may vary
Key Information
Developer
Interested in this project?
Contact the developer for more details, pricing, and availability.