We can't find the internet
Attempting to reconnect
Something went wrong!
Hang in there while we get back on track
South Bay Phase 4 By Dubai South
South Bay 4, South Bay
About this Project
Construction Status
Project Details
-
•Type: townhouse, villa
-
•Launch Date: 2023-11-01
-
•Completion Date: 2026-06-17
Amenities
Project Timeline
-
•Booking Started: 01/11/2023
-
•Construction Started: 22/04/2024
-
•Expected Completion: 17/06/2026
Available unit types from developer
TOWNHOUSE
4 Bedrooms
Available Layouts
| Layout Type | Size (sqft) | Floor Plan |
|---|---|---|
| Type A | - | - |
TOWNHOUSE
5 Bedrooms
Available Layouts
| Layout Type | Size (sqft) | Floor Plan |
|---|---|---|
| Type A | - | - |
VILLA
4 Bedrooms
Available Layouts
| Layout Type | Size (sqft) | Floor Plan |
|---|---|---|
| Type A | - | - |
VILLA
5 Bedrooms
Available Layouts
| Layout Type | Size (sqft) | Floor Plan |
|---|---|---|
| Type A | - | - |
VILLA
7 Bedrooms
Available Layouts
| Layout Type | Size (sqft) | Floor Plan |
|---|---|---|
| Type A | - | - |
Standard
during construction
50%handover
20%after handover
30%Monthly Payment Calculator
📋 Note:
This is an estimate only. Actual rates and terms may vary based on your credit profile, bank policies, and current market conditions. Additional costs like insurance, registration fees, and bank charges are not included.
Location
South Bay 4 , South Bay
The payment plan for South Bay Phase 4 by Dubai South is as follows: • 50% during construction • 20% on handover • 30% post handover
South Bay Phase 4 by Dubai South is a strong investment opportunity due to its prime location and luxurious living offerings. Situated in the heart of Dubai South, it provides excellent connectivity to key areas such as Al Maktoum International Airport and the Dubai Expo 2020 site. The development is designed with elegance and functionality, featuring spacious interiors and premium finishes. Its vibrant community-focused environment, combined with a wide range of recreational, wellness, and social spaces, makes it a desirable location for long-term living. The strategic location, along with high-quality construction, positions South Bay Phase 4 as a prime asset in Dubai's real estate market.
The delivery date for South Bay Phase 4 by Dubai South is set for June 2026. This timeline ensures the project will be completed with high-quality standards and attention to detail.
The starting price of South Bay Phase 4 by Dubai South is 3.2M AED.
South Bay Phase 4 is owned by Dubai South, a master-planned city development that focuses on creating integrated communities. Dubai South is known for its commitment to building world-class residential and commercial spaces, contributing to the growth and development of Dubai.
Launch Price
*Prices may vary
Key Information
Developer
Interested in this project?
Contact the developer for more details, pricing, and availability.