We can't find the internet
Attempting to reconnect
Something went wrong!
Hang in there while we get back on track
Zeston at Athlon
Zeston at Athlon, Athlon by Aldar
About this Project
Construction Status
Project Details
-
•Type: villa
-
•Completion Date: 2028-06-01
Amenities
Project Timeline
-
•Construction Started: 07/08/2025
-
•Expected Completion : 01/06/2028
Available unit types from developer
VILLA
4 Bedrooms
Available Layouts
| Layout Type | Size (sqft) | Floor Plan |
|---|---|---|
| Type A | - | - |
VILLA
5 Bedrooms
Available Layouts
| Layout Type | Size (sqft) | Floor Plan |
|---|---|---|
| Type A | - | - |
VILLA
6 Bedrooms
Available Layouts
| Layout Type | Size (sqft) | Floor Plan |
|---|---|---|
| Type A | - | - |
Standard
down payment
10%during construction
50%handover
40%Monthly Payment Calculator
📋 Note:
This is an estimate only. Actual rates and terms may vary based on your credit profile, bank policies, and current market conditions. Additional costs like insurance, registration fees, and bank charges are not included.
Location
Zeston at Athlon , Athlon by Aldar
The starting price for Zeston at Athlon is 2,800,000 AED.
Zeston at Athlon is owned by Aldar Properties PJSC, a renowned real estate developer known for creating high-quality properties across the UAE.
Zeston at Athlon, developed by Aldar Properties, is an exclusive villa community in the heart of Dubailand. This prestigious development offers a selection of 4, 5, and 6-bedroom villas designed for luxury living. Situated in a prime location, Zeston provides easy access to schools, shopping centers, healthcare facilities, and entertainment hubs, making it ideal for families and professionals alike. The villas feature sophisticated designs and spacious layouts, offering an exceptional living experience. With its central position in Dubailand, Zeston at Athlon is an excellent investment opportunity, combining convenience, comfort, and a prestigious address in one of Dubai's most sought-after communities.
Here’s a clear, concise answer without fuzzy words: Payment Plan for Zeston at Athlon: • 10% down payment at sales launch • 50% during construction • 40% on handover
The delivery date for Zeston at Athlon is scheduled for June 2028. All construction and finishing works are planned to be completed by this date, allowing owners to receive their properties on time.
Launch Price
*Prices may vary